Proposed Fortis Gas Line

Fortis Gas has two options to replace a gas line across the Fraser River. One of those options puts the along McBride, with a temporary construction station just North of Royal Ave. It will require closing McBride to single lane traffic only for a minimum of 3 months during the construction. The other option sends the pipe across the river several hundred meters downstream from Victoria Hill.

Additional details can be found on the Fortis website: https://talkingenergy.ca/project/pattullo-bridge-gas-line-replacement

Meet the Fortis representative at the Residents’ Association General Meeting on June 26 to learn more and voice your opinion!

Leave a Reply

Your email address will not be published. Required fields are marked *